GATE

Expansion of the MS-55 Metering Station for the Connection of New WP1 4-2 Wells

✓ Piping Installation
✓ Installation of Valves and Motor-Operated Valves (MOVs)
✓ Structural Steel Fabrication and Erection
✓ Foundation Construction
✓ Hydrostatic Testing and NDT
✓ Thermal Insulation and Protective Coating
✓ Pipe Rack PR-1 and PR-2
✓ Earthworks

2025